EUDR · Brazil · Soy · EN/PT
EUDR for Brazilian soy: farm polygons and lot-to-farm links for EU buyers
EU feed and food companies must file a due diligence statement for soybeans, soy meal and soy oil from 30 December 2026. Brazil has standard risk, so they need farm polygons, harvest dates and legality evidence for every lot. This bilingual English–Portuguese kit structures it.
Instant download (ZIP). Excel + LibreOffice compatible.
Screenshots
What's inside the ZIP
How it works – 3 steps
Collect
Fill the intake and the plot register – or paste your farm list. Every plot is checked as you type.
Check
Run the offline GeoJSON checker and clear everything the inconsistency tab lists.
Send
Export clean GeoJSON, complete the Art. 9 checklist and answer your buyer with the e-mail templates.
EUDR for Brazil soy exporters: what changes on 30 December 2026
The EU Deforestation Regulation (EUDR, Regulation (EU) 2023/1115) applies from 30 December 2026 to large and medium EU operators and traders, and from 30 June 2027 to micro and small enterprises (Regulation (EU) 2025/2650). From those dates, an EU company may only place soy (soya beans HS 1201, soya flour and meal 1208 10, soya-bean oil 1507, oil-cake 2304 – Annex I as amended by Delegated Regulation (EU) 2026/2102) on the EU market if it is deforestation-free (no deforestation after 31 December 2020), produced legally under the laws of Brazil, and covered by a due diligence statement (DDS).
As a supplier in Brazil you normally do not submit the DDS yourself – your EU buyer does. But the buyer can only do that with your data: geolocation of every plot, harvest dates, quantities, land and legality documents. That is why EU importers are now sending soy suppliers questionnaires, Excel templates and GeoJSON requests. This kit gives you one organised place to prepare those answers.
Brazil is not listed in Implementing Regulation (EU) 2025/1093, so it has the default standard risk level. EU operators must run full due diligence (information, risk assessment, risk mitigation) – expect detailed questions and document requests.
What EU buyers ask their suppliers for
| Buyer request | Legal basis | Where in the kit |
|---|---|---|
| Geolocation of every plot of land (points with ≥ 6 decimals; polygons for plots > 4 ha) | Art. 2(28), Art. 9(1)(d) | Tab 02 Plot register + offline checker + GeoJSON sample |
| Date or time range of production / harvest | Art. 9(1)(d) | Tab 02 (production start/end) |
| Product description, HS code, quantity (net mass) | Art. 9(1)(a)(b) | Tab 04 Lots & links |
| Proof the land was not deforested after 31 Dec 2020 | Art. 2(13), Art. 9(1)(g) | Tab 05 Evidence register |
| Proof of legal production (land-use rights, labour, tax, environment, third-party rights…) | Art. 2(40), Art. 9(1)(h) | Tab 05 + tab 06 questionnaire |
| Supplier identification and supply-chain information | Art. 9(1)(e)(f) | Tab 01 Intake |
| Answers to a risk questionnaire (mixing, traceability, sub-suppliers) | Art. 10 | Tab 06 Buyer questionnaire + DOCX |
Records must be kept for 5 years (Art. 9(1)). The kit does not replace your buyer's own template – it helps you fill any template quickly and consistently.
EUDR geolocation for soy farms in Brazil: the rules that trip suppliers up
Format (EU GeoJSON file description)
- WGS84 / EPSG:4326 coordinates, order [longitude, latitude]
- At least 6 decimal places
- Point, MultiPoint, Polygon, MultiPolygon only
- Polygons closed, ≥ 4 positions, no holes or self-intersections
Typical errors the workbook flags
- Coordinates rounded to 4–5 decimals
- Plot > 4 ha given as a single point
- Latitude/longitude swapped or outside Brazil
- Duplicate coordinates across farmers; harvest end before start
Soy farms are almost always larger than 4 ha, so every production plot needs a polygon. Traders and crushers must link each vessel or batch of beans, meal or oil to all farms that supplied it – the lot-to-plot tab (up to 600 links per file) is designed for this, and the checker flags polygons that are open, self-intersecting or have too few vertices.
EUDR due diligence statement: what a soy supplier must give the EU buyer
The DDS is filed by the EU operator in the EU information system. It references the geolocation and product data you supply. In practice buyers ask for three deliverables per shipment: (1) a plot list or GeoJSON file, (2) a lot-to-plot link showing which plots supplied each container, and (3) evidence of deforestation-free and legal production. Tabs 02, 04 and 05 of the workbook produce exactly these, and tab 07 counts inconsistencies before you send anything.
Typical Brazilian evidence: CAR number, property registration (matrícula / CCIR), environmental licences, embargo-list checks, labour-compliance records, silo and crushing-plant records, and a land-use-change screening against the 2020 baseline.
Brazilian soy in EU trade
Eurostat Comext shows the EU imported about €3.5 billion of soybean meal/oil-cake (HS 2304) and €2.3 billion of soybeans (HS 1201) from Brazil in 2025. Most of it is shipped by large traders; this kit is aimed at farms, cooperatives, originators and mid-size traders who must answer their customers' data requests.
Sample: plot register with automatic checks (Brazil soy, fictional data)
This is a live extract of the filled example workbook included in the kit. The CHECK columns are Excel formulas – they flag missing decimals, plots needing polygons, locations outside the country, duplicates and date errors.
| A | B | E | H | I | J | K | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 5 | Plot ID ID da parcela | Producer / farmer name Nome do produtor | State (UF) Estado (UF) | Area (ha) Área (ha) | Geometry type Tipo de geometria | Latitude (WGS84, ≥6 decimals) Latitude (WGS84, ≥6 decimais) | Longitude (WGS84, ≥6 decimals) Longitude (WGS84, ≥6 decimais) | CHECK: precision VER: precisão | CHECK: polygon needed VER: polígono | CHECK: location VER: localização | CHECK: duplicates VER: duplicados | CHECK: dates VER: datas | STATUS |
| 6 | BR-MT-0001 | Fazenda Exemplo Soja A (fictional) | MT | 1850.00 | Polygon / Polígono | -12.541234 | -55.721234 | OK | OK | OK | OK | OK | OK |
| 7 | BR-MT-0002 | Fazenda Exemplo Soja B (fictional) | MT | 960.00 | Polygon / Polígono | -12.612345 | -55.801234 | OK | OK | OK | OK | OK | OK |
| 8 | BR-MT-0003 | Fazenda Exemplo Soja C (fictional) | MT | 640.00 | Point / Ponto | -13.051234 | -55.911234 | OK | POLYGON REQUIRED (>4 ha) / POLÍGONO NECESSÁRIO (>4 ha) | OK | OK | OK | FIX / CORRIGIR |
| 9 | BR-PR-0004 | Sítio Exemplo Soja D (fictional) | PR | 38.00 | Polygon / Polígono | -24.951234 | -53.451234 | OK | OK | OK | OK | OK | OK |
| 10 | BR-PR-0005 | Sítio Exemplo Soja E (fictional) | PR | 22.00 | Polygon / Polígono | -24.961200 | -53.472100 | Check decimals (<6?) / Verificar decimais (<6?) | OK | OK | OK | OK | REVIEW / REVER |
| 11 | BR-MT-0006 | Fazenda Exemplo Soja F (fictional) | MT | 1200.00 | Polygon / Polígono | -12.701234 | -55.651234 | OK | OK | OK | OK | End before start / Fim antes do início | FIX / CORRIGIR |
| 12 | |||||||||||||
| 13 |
All names, coordinates and documents in the example are fictional.
FAQ
Does the EUDR apply to soy exporters in Brazil?
The legal obligations (due diligence statement) fall on the EU operator placing the soy on the EU market. Suppliers in Brazil are not directly obliged, but EU buyers can only comply with their suppliers' data – plot geolocation, harvest period, quantities and evidence – so in practice every supplier to the EU must provide it.
When does the EUDR apply to soy?
From 30 December 2026 for large and medium operators and traders, and from 30 June 2027 for micro and small enterprises, according to Regulation (EU) 2025/2650.
What geolocation format do EU buyers need?
Coordinates in WGS84 with at least 6 decimal places, one point per plot up to 4 ha and a polygon for plots above 4 ha. The EU information system accepts GeoJSON with [longitude, latitude] order; the kit's offline checker validates this.
What is Brazil's EUDR country risk level?
Brazil is not listed in Implementing Regulation (EU) 2025/1093, so it has standard risk. EU operators must do full due diligence – information, risk assessment and, where needed, risk mitigation – so buyers typically ask more questions and request more evidence.
Is this an official EU tool or a certification?
No. It is an independent data-organisation kit. It does not certify compliance or file due diligence statements. Official sources are cited so you can verify every rule.
Does the EUDR cover soy meal and soy oil?
Yes. Annex I covers soya beans (1201), soya flour and meal (1208 10), soya-bean oil (1507) and oil-cake (2304). Delegated Regulation (EU) 2026/2102 amends Annex I – check the act for changes such as seeds for sowing.
How do I link a vessel of soy meal to farms?
List every farm (polygon) that supplied the beans crushed for that batch in tab 04 B. The workbook counts links per lot and flags links to unknown farm IDs.
Are updates included?
Yes: free updates until 30 Jun 2027. If the cited texts, the country benchmarking list or the GeoJSON File Description change, the updated files appear in your Gumroad library and buyers are notified by e-mail.
Official sources
Checked on 29 September 2026. Links open the official EU pages.
- Regulation (EU) 2023/1115 (EUDR), consolidated text incl. Regulation (EU) 2025/2650 – EUR-Lex, consolidated 26 Dec 2025
- Regulation (EU) 2025/2650 amending the EUDR (application dates) – Official Journal of the EU, 23 Dec 2025
- Regulation on deforestation-free products – application dates – European Commission, DG ENV, checked 29 Sep 2026
- Delay until December 2026 and other developments in the implementation of the EUDR – European Commission, Access2Markets, 28 Jan 2026
- EUDR Information System – GeoJSON File Description – European Commission (TRACES), updated 17 Aug 2026
- Implementing Regulation (EU) 2025/1093 – country benchmarking – EUR-Lex, 22 May 2025
- EUDR implementation – how the EUDR applies outside the EU – European Commission, Green Forum, checked 29 Sep 2026
- FAQ – EUDR implementation – European Commission, see page
- Eurostat Comext – EU imports by partner and product (DS-045409), 2025 – Eurostat, dataset updated 15 Sep 2026
Be ready before your buyer's deadline
Organise plots, lots and evidence once – then answer every EU buyer's EUDR request from the same file.
Get the kit · €79Not legal advice. This kit is a data-organisation tool; it does not certify compliance, does not file due diligence statements and is not an official European Commission product. RegPacks is not affiliated with the EU. Regulations and guidance may change – check the official sources.






